Public Review Documents

The following documents are subject to public review:

Project South Bay Advanced Recycled Water Treatment Facility Project 
Review Period Feb. 25, 2010- March 29, 2010
Public Review Draft Final EA/IS-MND and NOD
Description

The proposed project would construct an advanced recycled water treatment facility capable of producing up to 10 million gallons of ultra-pure recycled water per day using advanced treatment technologies including microfiltration, reverse osmosis and ultraviolet disinfection. The product water from the proposed project would be blended with the tertiary effluent from the Santa Jose/Santa Clara Water Pollution Control Plant to reduce the total dissolved solids concentration in the blended water to a maximum of 500 mg/L. The district and the City of San Jose, which have discretionary approval over the project, are respectively the lead agency and the responsible agency under California Environmental Quality Act (CEQA). The United States Bureau of Reclamation, which has discretionary approval over project funds allocated through the Title XVI program, is the lead agency for the proposed project under the National Environmental Policy Act (NEPA).

   

Project Rinconada Water Treatment Plant Road Repairs and Improvements Project 
Review Period  Feb. 8, 2010 -- Feb. 23, 2010
Public Review Draft Engineer's Report
Description

The proposed Project would :1) Repair and resurface approximately 1200 linear feet of the Service Road and 300 linear feet adjacent to the Clarifiers. 2) To widen the road at the east and west corners near the Warehouse so that trucks could maneuver their vehicles for entering and exiting the lower area of the plant. 3) Construction of the truck turnout at the North Service Road (Approximately 200 feet).

 

Project Microwave Telecommunications ND
Review Period Nov. 11, 2009 -- Dec. 02, 2009
Public Review Draft IS Microwave Telecom North FINAL.pdf
Description

The Project would establish a microwave network for voice and datacommunication between District facilities and provide a link to the county-wide emergency communication system.



Project Santa Teresa Water Treatment Plant Incompatible Materials Project
Review Period Sept. 21 - Oct. 27, 2009
Public Review Draft

Engineer's Report

Description

The proposed Project is located at Santa Clara Valley Water District's (District) Santa Teresa Water Treatment Plant (STWTP) in unincorporated Santa Clara County.



Project Seepage Monitoring Facilities Repair at Almaden and Calero Dams
Review Period Sept. 10 - Oct. 10, 2009
Public Review Draft Notice of Intent to Adopt and Mitigated Negative Declaration
Description

The proposed project consists of repair of seepage monitoring facilities at Almaden and Calero Dams. This would involve removal of sediment and vegetation, as well as re-pouring of concrete for the V-ditches at the Calero location only. DSOD has requested that the work be completed this calendar year.



Project Rodent Control and Burrow Removal on 14 Santa Clara Valley Water District Dams
Review Period July 30 - August 31, 2009
Public Review Draft Notice of Intent to Adopt a Mitigated Negative Declaration
Description

The proposed Project consists of:

1) Control burrowing rodent populations on dams through live trapping and bait stations (continuation of existing 2007-2010 program); and

2) Remove small mammal burrows on dams through excavation and compaction or grouting.



Project East Pipeline Rehabilitation Project between Patt Avenue and Ocala Avenue - Project No. 94344006
Review Period August 14 - August 25, 2009
Public Review Draft Engineer's Report
Description

The proposed Project involves rehabilitating a three mile segment of the East Pipeline which is located along White Road, between Patt Avenue and Ocala Avenue, in east San Jose, California. The proposed Project has a multi-faceted scope including basic maintenance, mandated improvements, and corrective modifications. The objective of the proposed Project is to increase the reliability and useful life of the East Pipeline, helping to ensure the long term reliable delivery of potable water to consumers within the pipeline’s service area. A public hearing on the Engineer’s Report will be held at 10:00 AM on August 25, 2009, at the Santa Clara Valley Water District, 5700 Almaden Expressway, San Jose, California.



Project West Pipeline Rehabilitation Project Cox Avenue to Granger Avenue - Project No. 94364002
Review Period July 17 - July 28, 2009
Public Review Draft Engineer's Report
Description

The proposed Project involves rehabilitating a six mile segment of the West Pipeline, located on the west side of the San Jose Metropolitan Area. The six mile segment is located in Saratoga, Cupertino, and Los Altos. A temporary shutdown of this segment of the treated water supply piping will be necessary to complete this work, but alternate sources will provide water without service interruption.



Project Alviso Slough Restoration
Review Period June 16 to July 30, 2009
Public Review Draft
Description Recirculation allows the public an opportunity to comment on significant changes to a DEIR that have been made following the original DEIR formal comment period. A portion of the Alviso Slough Restoration Project DEIR (Water and Sediment Quality, Section 3.2) has been revised and is being recirculated pursuant to CEQA Guidelines, Section 15088.5. Recirculation is required when significant new information is added to a draft EIR after public notice is given but prior to certification by the decision-making body. Significant new information would include a disclosure of new significant environmental impacts that would result from the project, new mitigation measures proposed to be implemented, or a substantial increase in the severity of environmental impacts not covered in a previous document. The goal of the recirculation is to allow the public a meaningful opportunity to comment on new project impacts and proposed mitigation. Technical discussions duplicated in Appendix B were removed to focus the discussion. Changes in the document are marked as strikeout or insertions to facilitate review.


Project Gold Street Educational Center
Review Period July 15 - July 28, 2009
Public Review Draft Draft Final IS/MND with RTC
Description Adopt a Mitigated Negative Declaration for the Gold Street Educational Center Description: The proposed project would include: a gazebo, restroom, parking area, paths, interpretive signage, and landscaping. It will provide a link to adjacent recreation trails, and an opportunity to educate the public about the history of Alviso in association with the Guadalupe River, and the Valley Water's Mission of water supply, water conservation, flood protection, and watershed stewardship.


Project Water Transfer
Review Period Feb 29th - March 23, 2009
Public Review Draft NOI: To adopt a Neg Dec for
a One-Year Semitropic Groundwater
Intrabank Transfer from
SCVWD to Poso Creek Water Company
Description The proposed project is the one-time transfer
of up to 10,000 acre-feet of State Water Project
water stored by SCVWD in the Semitropic Water
Bank to Poso Creek Water Company for future
withdrawal and delivery to Wheeler
Ridge-Maricopa Water District in 2009.


Project Water Transfer
Review Period Feb 29th - March 23, 2009
Public Review Draft Initial Study and Environmental Checklist
Description The proposed project is the one-time transfer
of up to 10,000 acre-feet of State Water Project
water stored by SCVWD in the Semitropic Water
Bank to Poso Creek Water Company for future
withdrawal and delivery to Wheeler
Ridge-Maricopa Water District in 2009.


Project San Luis Reservoir Lowpoint Improvement Project
Review Period Aug. 29th - Sep. 29th, 2008
Public Review Draft NOP: Low Point Improvement Draft EIR
Description



Project Alviso Slough Restoration Project
Review Period June 13 - July 28, 2008
Public Review Draft
Description